search:

GO

 
       
   
   
 
CHEC possesses superiority of the tradition of specialization in marine engineering. ZHEC has fully applied its parent company's advantage in this area in Hong Kong, and now it occupies a leading position within the industry.


ZHEC has constructed many wharves for both passenger and cargo ships. The main projects include the Kwai Chung Container Terminal No. 8 Development, the Lamma Power Station Jetty Extension, and the new pier at the Wanchai Convention and Exhibition Centre. The excellent quality of these projects has won them wide acclaim. Projects currently undertaken by ZHEC include one for the maintenance of ferry terminals exclusively operated by the Hong Kong SAR Government and another for port and embankment maintenance.


ZHEC is also proficient in sea reclamation and construction of revetments, breakwaters and sea walls. The Lamma Power Station Ash Lagoon and Jetty Extension Project, which was carried out through the use of advanced technology in 1993, still receives high praise within the industry. In recent years ZHEC has also participated in large-scale projects such as the Chek Lap Kok New Airport Platform, the Tung Chung New Town Reclamation and the Construction of Aldrich Bay Typhoon Shelter Reclamation Projects, as well as in the "Hutchison-Whampoa" International Container Terminal in Indonesia and a container terminal in Panama.

 

 
 
 

 

 

 


Lamma Power Station - Jetty Extension


KCRC Tsuen Wan 302 Reclamation


Kwai Chung Container Port, Terminal 8 Development

 

 

 

 

 
     
Copyright © 2000-03 Zhen Hua Engineering Co. Ltd All rights reserved.||