ZHEC has a large variety of marine and land piling machinery and technical personnel, which give it the lead over other piling foundation companies in the industry.

Piled Foundation Projects that ZHEC has undertaken in recent years include the Foundation for Shatin Area 14B Phase 4, the Piled Foundation Works for Standard Primary School at Ko Chiu Road, Kwun Tong, and the Ma Wan Infrastructure Construction of Tung Wan Pier - Pile Caps, Pier Deck and Seawater Intake Pumping Station.

In the Lamma Power Station Jetty Piling Project, ZHEC drove piles more than 30 metres below the seabed, setting a new record for driving one of the deepest marine piles in Hong Kong. The static load test carried out by ZHEC on a marine raking pile in Lamma Island Pier marked the first time that such a pile test had been conducted in Hong Kong.

The Terminal 8 Container Port Piling Project and the Lamma Island Power Station Jetty Piling Project carried out by ZHEC represent the highest level of marine piling capability in the Hong Kong region, and are highly regarded by the industry.

 

 
 

 

 

 

 

 

 

 



Foundation for Shatin Area 14B Phase 4

 

Ma Wan Infrastructure Construction of Tung Wan Pier-Pile Caps, Pier Deck and Seawater Intake Pumping Station
   
     