Route 9
The Works comprises of the construction of about 3.2 km of dual 2-lane carriageway with an additional climbing lane at uphill locations including...
click here for download pdf. file

 

 

Balboa
The Works comprises of the construction of about 3.2 km of dual 2-lane carriageway with an additional climbing lane at uphill locations including...
click here for download pdf. file

 

 

Construction of Road T7 in Ma On Shan
The Works comprises of the construction of about 3.2 km of dual 2-lane carriageway with an additional climbing lane at uphill locations including...
click here for download pdf. file

 

 

Chek Lap Kok - Site Preparation
The project involved the formation of 1280 hectares of reclaimed islands; West Brothers (Tai Mo To), East Brother (Siu Mo To) and Chek lap Kok...
click here for download pdf. file

 

 

KCRC West Rail CC-604 Pat Heung Maintenance Centre
The scope of work includes piling, the construction of substructure, superstructure, architectural builders' works and finishes, building services and external civil works for the EMU maintenance building...
click here for download pdf. file

 

 

 

KCRC West Rail Contract CC302 - Tsuen Wan Reclamation

The Tsuen Wan Reclamation Contract comprised of the construction of a new sloping and vertical seawall in Tsuen Wan Bay approximately 70 metre south of the existing seawall and reclaimed the area within the new seawall to accommodate the new Tsuen Wan West Station...
click here for download pdf. file

 

 

Eastern Harbour Crossing/Lam Tin Tunnel, Site Formation & Associated Works
The works comprise a pair of running tunnels from YAT to LAT construsted as bored tunnels with the exception of 1 section approximately 90m long connecting to YAT which shall be cut and cover construction...
click here for download pdf. file
 

 
     

 

 

 

 

 

 

 

 

 

 

 

   
     