| Route 9 |
The Works comprises of the construction
of about 3.2 km of dual 2-lane carriageway with an additional
climbing lane at uphill locations including...
|
| click here for download
pdf. file |
|
| Balboa |
The Works comprises of the construction
of about 3.2 km of dual 2-lane carriageway with an additional
climbing lane at uphill locations including...
|
| click here for download
pdf. file |
|
| Construction of Road T7 in Ma On Shan |
The Works comprises of the construction
of about 3.2 km of dual 2-lane carriageway with an additional
climbing lane at uphill locations including...
|
|
click here for download pdf. file |
|
| Chek Lap Kok
- Site Preparation |
The project involved the formation of 1280
hectares of reclaimed islands; West Brothers (Tai Mo To),
East Brother (Siu Mo To) and Chek lap Kok...
|
| click here for download
pdf. file |
|
| KCRC West Rail CC-604 Pat Heung Maintenance Centre
|
The scope of work includes piling, the construction
of substructure, superstructure, architectural builders' works
and finishes, building services and external civil works for
the EMU maintenance building...
|
|
click here for download pdf. file |
|
KCRC West Rail Contract CC302 - Tsuen Wan
Reclamation |
The Tsuen Wan Reclamation Contract comprised
of the construction of a new sloping and vertical seawall
in Tsuen Wan Bay approximately 70 metre south of the existing
seawall and reclaimed the area within the new seawall to accommodate
the new Tsuen Wan West Station...
|
| click here for download
pdf. file |
|
| Eastern Harbour Crossing/Lam Tin Tunnel, Site Formation & Associated Works
|
| The works comprise a pair of running tunnels
from YAT to LAT construsted as bored tunnels with the exception
of 1 section approximately 90m long connecting to YAT which
shall be cut and cover construction... |
|
click here for download pdf. file |
| |

|
|
| |
|
|
|

|