{"id":3331,"date":"2022-09-23T13:00:00","date_gmt":"2022-09-23T05:00:00","guid":{"rendered":"https:\/\/chec.miracledeveloper.com\/project\/%e5%90%88%e7%b4%84%e7%b7%a8%e8%99%9f%ef%bc%9ahy-2019-01-%e6%b8%af%e7%8f%a0%e6%be%b3%e5%a4%a7%e6%a9%8b%e9%a6%99%e6%b8%af%e5%8f%a3%e5%b2%b8-%e7%ac%ac%e4%ba%8c%e9%9a%8e%e6%ae%b5%e5%8f%8a\/"},"modified":"2022-09-29T13:10:53","modified_gmt":"2022-09-29T05:10:53","slug":"hong-kong-zhuhai-macao-bridge-hong-kong-boundary-crossing-facilities-phase-2-and-other-works","status":"publish","type":"project","link":"https:\/\/www.chechk.com\/en\/project\/hong-kong-zhuhai-macao-bridge-hong-kong-boundary-crossing-facilities-phase-2-and-other-works\/","title":{"rendered":"HONG KONG \u2013 ZHUHAI \u2013 MACAO BRIDGE HONG KONG BOUNDARY CROSSING FACILITIES \u2013 PHASE 2 AND OTHER WORKS"},"content":{"rendered":"<p>Construction of 2 nos of vertical The project contract includes the remaining works and enhancements to the HKBCF, including vehicle clearance plazas, private vehicle kiosks and associated road works; additional pick-up areas for cross-boundary buses, shuttle buses and franchised buses at the north-south public transport interchange; public toilets; refuse collection points; enhancement works to the passenger clearance building; landscaping and associated works; and installation of specialised equipment, etc.<\/p>\n","protected":false},"featured_media":2588,"template":"","meta":{"_seopress_robots_primary_cat":"","site-sidebar-layout":"default","site-content-layout":"default","ast-global-header-display":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"default","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":""},"categories":[42,38],"tags":[],"class_list":["post-3331","project","type-project","status-publish","has-post-thumbnail","hentry","category-bridge-and-road-en","category-construction-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.chechk.com\/en\/wp-json\/wp\/v2\/project\/3331","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.chechk.com\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.chechk.com\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.chechk.com\/en\/wp-json\/wp\/v2\/media\/2588"}],"wp:attachment":[{"href":"https:\/\/www.chechk.com\/en\/wp-json\/wp\/v2\/media?parent=3331"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.chechk.com\/en\/wp-json\/wp\/v2\/categories?post=3331"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.chechk.com\/en\/wp-json\/wp\/v2\/tags?post=3331"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}