This contract is for the Engineering, Procurement and Construction (EPC) delivery of Package 1 of the IWMF to be located at the Tuas View Basin site. It consists of Phases 1A and 1B of the Waste to Energy (WTE) Facility, the Materials Recovery Facility (MRF) and Supporting Infrastructure and Siteworks for the overall IWMF site. Options under Package 1 include the EPC delivery of WTE Phase 2A and 2B, IFA acid washing and metal hydroxide sludge stabilisation.