construction of permanent seawall and reclamation (about 3.3 hectares) at North Point between Power Street and the breakwater near Hing Fat Street;construction of temporary open channel connecting the outfalls along the existing seawall to new outfalls; and modification of stormwater drainage system at Oil Street.