This project included provision of hoarding (water barrier), Demolish existing reinforced concrete wave deflector and seawater pipe, Supply and install precast-reinforced wave wall, Supply and install seawater pipe, Reinstate existing EVA, Remove and re-install existing lamp posts, Trench excavation and shotcrete, Backfilling, Reinstate existing Type 2 armour profile.
This project improves the deficiencies of the infrastructure of HKUST and creates a safer and more convenient campus environment for students and teachers.